Just when you think you have it made, you remember the shed with its very old shingles. A high wind the other day stripped a few off allowing rain (if we ever get any) to enter the shed.
The new shingles are a two tone grey and seem to last better in the hood. The week spots were re-enforced with triple lays and tar paper was put down first. The hardware guy said not putting down tar paper is a mistake a lot of people make, particularly on sheds.
Hopefully, the shingles will last for many years.
Normally, shingling a shed this size would take me about 4 hours. This one took me 12, mainly due to the condition of my back. The back fusion is set for the end of the month. It would appear that the sooner the better.
I have a lot of work to do before then as the Doc said I will be useless lifting etc. for 2 to 6 months. I figure on allowing 2 to 4 days. Elaine calls me a stubborn old f*rt! She is currently on the way to Israel for 12 days.
Lots of time to get some work done without somebody saying that I shouldn't be doing that! :-}